top of page

Keller Foundations 

Richmond, British Columbia

Keller Foundations(formerly North American Construction) has contracted GD Welding & Fabricating Ltd since 2012 for the following projects, focusing on splicing piles, Welding piles, welding end plates, welding pile caps, welding driving shoes, welding tension piles, equipment repairs, fabricating and welding new equipment. ​​

  •  

  • Intraurban - 200 8" x 500 Pile splices, 453 8" welded endplates, 32 12.5" welded end plates, formed 200 8" 2x.250 backing rings. Supply 3 welding trucks and manpower. (Burnaby)

  • Pier West - Tool Repair, Beam Cutting. Supply welding truck.(New West)

  • Rio Tinto Sheet Pile Cells - Welding bracing, whalers, install sheets. Supply welding truck. (Kitimat)

  • Brooklyn Tower - 241 36" x .500 pile splices, Final cut off's with 1/32th tolerance, cap plate and collars. Forming 178 36" 8"x.250 collars, Forming 250 36" 2"x.250 backing rings. supply 3 welding setups and manpower. (Kelowna)

  • Atmosphere - Beam Pairing, I-Beam splicing, tool repair. Supply two welding trucks and manpower.(Richmond)

  • Suterbrook - Ibeam pocket fab, welding anchor details, anchor rehab, whalers, tool repair. Supply 1-5 welding trucks and manpower (Port Moody)

  • Hamilton Village - 444 12" and 16' x .500 Pile splices, end plates, cutting and bevelling. Supply 5 welding trucks, welders, zoomboom and manpower. (Agassiz)

  • Ella Tower Project - 220 36" x .500 Pile Splices. Supply 3 welding rigs and three full ticketed welders (Kelowna)

  • Poco Rec Center Phase 1- 450 12", 18", 24" x .625 Piles, 850 splices, 450 end plates. Supply 3 welding trucks and two welding trailers with all cutting gear, consumables and welding man power. (Port Coquitlam)

  • 72nd Overpass - 39 36"x.750 piles, 160 splices. Dual stiffener rings on each pile.  Supplying 3-4 welding trucks, welding procedures and all welding consumables for duration of project. (Delta)

  • Azure High Rise - 650 10"concrete piles, 850 Splices (New Westminster)

  • 96 ave CFA - Build casings (Surrey)

  • Nissan Autobody Shop - 120 8",10" and 12"Steel piles, end plates, cut-offs and piles caps(Burnaby)

  • CIBC - 26 16"galvanized steel piles, cut-offs, pile caps and fabricate load test. (Burnaby)

  • Water Pump Station - 6 20" 3/4 wall piles spliced, end caps, cut offs.(Burnaby)

  • Seaspan expansion -130 16"steel pile cut-offs and welding of tension piles (North Van)

  • Port Melon Pulp & Paper expansion - 25  16"H-beams, spliced, driving shoes, tension piles (Sunshine Coast)

  • K+S Potash handling shed - 450 8" 24" and 36"steel piles, 1250 slices(Port Moody)

  • Penticton Bridge - 50 24"Steel piles, 100 splices, soldier piles with framing for middle of cannel, walk way (Penticton) 

  • Overpass upragde, 6th St - 15 30"piles with reenforcing welded on inside (New Westminster)

  • Tannery Rd upgrade for South Perimeter Rd 30"Steel piles, 60 splices (Delta)

  • Evergreen Skytrain Line - 221 24",36" and 72"Steel piles, 600 splices, build casings.(Coquitlam, Port Moody)

  • New bridge, 232nd St  20 24" splices, fabricate steel guide frame for hard ground (Maple Ridge)

  • Overpass, 16th Ave  - 30 end plates, 80 24"steel pile splices( Surrey) 

  • Delta Cedar Sheet pile wall (Delta) 

  • Front St High Rise - 200 10" and 24" concrete pile splices (New West)

  • ILM transmission line 250 30", 36",42" and 48" steel pile splices, welding of rebar cages (Pitt Meadows, Mission, Harrison)

  • BFI Parking Lot 200 8" steel pile splices and end plates (Coquitlam)

  • Kensington On/Off ramp - 1700 10"concrete pile splices (Burnaby)

  • CN Rail upgrade  250 12" H-Beam splices(Surrey) 

  • Mercedes Benz dealership 350 8",12" and 16" steel pile splices and end plates (Vancouver) 

  • Highland Valley Copper Mine expansion - 820 driving shoes, 650 16" and 24"steel pile splices (Logan Lake)

JJM CONSTRUCTION 

Delta, British Columbia

JJM Construction has contracted GD Welding & Fabricating Ltd for the following projects, focusing on Barge and Marine work. ​

  • ME209 Spud Build - Supply 12 Welders and welding trucks to site to fabricate and weld out spuds.

  • Full Rebuild of ME209 Barge Stern - Supply 12 welders and welding trucks to site to fit, fab and weld out new stern

  • Fabricate Cages - Supply 4 welders and welding trucks to site to fabricate and weld out cages.

  • Clam Bucket Rebuild - Supply 2 welders and welding trucks to site to to gouge off shanks, fix cracks and build up cutting edge

  • ME501 Emergency Repair - Send two welding trucks to Mission to repair two large holes in deck after stations were ripped off barge.(Mission)

  • The Beast - Weld structural steel for pile upright system. Supply 4-7 welding units and welders

Henry Foundations 

Langley, British Columbia

Henry Foundations has contracted GD Welding & Fabricating Ltd for the following projects.​

  • 200th st CIBC - 200 36" x .500 pile splices. Supply all welding and cutting gear and manpower. (Langley)

  • Lynn Creek Bridge - 100 30" x 1" pile splices and cutting J hooks in casings. Supply all welding and cutting gear and manpower.(North Vancouver) 

  • Water Treatment Plant - Whalers and Strut install and demo. Supply three welding units and manpower (North Vancouver)

  • 5th and Manitoba - Install whalers and rakers. Supply three welding units and manpower (Vancouver)

  • Vista - Install whalers and rakers. Supply three welding units and manpower. (Coquitlam)

BJM JV

Delta/Kitimat, British Columbia

BJM has contracted GD Welding & Fabricating Ltd for the following projects.

  • Rio Tinto Test Pile Program - Splicing and welding 36"x .750, 42" x .750 and 42" x 1" Pipe piles, fabricating handrails, boonchang, and walk ways. Supply three welding trucks and manpower. (Delta) 

  • Rio Tinto Wharf - Splicing and welding 42" x 1" wall piles onsite. Supply welding supervisor and welders. (Kitimat

Bel Pacific LTD./ PGE

Burnaby, British Columbia

Bel Pacific LTD has contracted GD Welding & Fabricating Ltd for the following project.

  • The Arc - Supply Welding rig, welder, helper and all consumables to complete each splice on I-Beams. Do repairs to equipment if needed.(Vancouver)

  • The Arc - Supply two welding units to site to Fabricate load tests and chairs, weld on anchors, cut holes bigger on anchors, gouge beams, (Vancouver)

  • Bel Pacific Yard - Repair all the drill casings and augurs after the The Arc project. (Burnaby)

  • Parcel 15 - Weld tieback anchors. Supply 2 welding units. (Vancouver)

  • Viewstar - Ibeam pairing, Fabricate and weld anchor head details. Supply 2-3 welding units

GFL Industrial. 

Vancouver, British Columbia

GFL Industrial has contracted GD Welding & Fabricating Ltd for the following projects.​

  • Parcel 15 - Install anchor head units and corner braces. Supply two welding units and manpower. (Vancouver)

KAYNIC CONSTRUCTION

Grand Prairie, Alberta

Kaynic Construction has contracted GD Welding & Fabricating Ltd for the following projects 

  • Fabrication of 100 barrel tanks - rolling steal, welding flanges, manholes, ladders, tanks, skids(Grand Prairie)

  • Shoot  replacement for frac sand (Grand Prairie)

  • Ainsworth shutdowns - Wave feeders refurb, handrails, rake conveyor replacement, in-feed refurb, press tarping brackets upgrade.

  • Fertizer transfer station - Install, tower for bucket elevator, walk ways, ladders, handrails, bucket elevator, conveyor systems.(Rycroft)

NORTH PRO CONTRACTING 

100 Mile House, British Columbia

North Pro Contracting has contracted GD Welding & Fabricating Ltd for the following projects, focusing on mill and mine shutdowns. ​

  • Norbord Inc shutdown - Rake conveyor replacement, green bin refurb, jack ladder trough wall, in-feed chains 100 Mile House) 

  • West Fraser Mill upgrade - fabricating walk ways, stairways, doors, dust collection, guards, gates, handrails (100 Mile House) 

  • Ainsworth Lumber shutdown  - jack ladders replacement and refurb, green bin refurb (100 Mile House, )

  • Ainsworth Lumber shutdown - Ash conveyor replacement, drive unit for ash conveyor replacement, fabricate new shoots (100 Mile House)

  • Greymont Pavilion Plant dust collection system - fabricating shoots, structural steel, Troughs, Flights on Screws (Cache Creek) 

PACIFICA PILING

Maple Ridge, British Columbia

Pacifica Piling has contracted GD Welding & Fabricating Ltd for the following project

  • 10 30" x 11/16 wall slices and 8 cuts off to length, supply manpower and zoom boom.

  • 52 8.56" x.250 pile splices. supply two welding rigs and zoom boom.

KAMLOOPS AUGORING AND BORING

Kamloops, British Columbia

Kamloops Auguring And Boring has contracted GD Welding & Fabricating Ltd  for the following project

  • Highway 1 Casing Pipe - Weld sections of 10' pipe in position, repair damaged pipe and cutting head from huge Marble bolder, repair equipment onsite (Surrey)

AMIX GROUP

Surrey, British Columbia

Amix Group has contracted GD Welding & Fabricating Ltd for the following project

  • Stanchion Install -Supply 3 welders and rigs to site to do install of log stanchions (Surrey)

  • Stanchion Install - Supply 4 welds and rigs to install stanchions on barge.(Surrey)

RIZE ALLIANCE

Vancouver, British Columbia

Rize Alliance has contracted GD Welding & Fabricating Ltd for the following project.

  • Gold House - Ibeam cut offs, install saddles, structural steel. Supply man power and welding truck

  • Containers 2 building - Supply welding truck and helper for pile cut-offs, Welding of tension piles, sheet pile cut offs (Vancouver)

LEDCOR

Vancouver, British Columbia

Ledcor has contracted GD Welding & Fabricating Ltd for the following project

  • Acura Dealership -  install structural steel (Vancouver)

MAGNUM CONCRETE

Aldergrove, British Columbia

Magnum Concrete has contracted GD Welding & Fabricating Ltd for the following project

  • Concrete plant refurb - Replace gates on bins, resurface bins, replace shoots on bins.

CATHERWOOD TOWING

Mission, British Columbia

Catherwood Towing has contracted GD Welding & Fabricating Ltd for the following project

  • Welding on Barges - Fabricate and weld out bollards on two barges (Surrey)

Econospan Chase, British Columbia

Econospan has contracted GD Welding & Fabricating Ltd for the following project.

  • Morrey Nissan Auto Body Shop - Supplied Iron workers, welding trucks, foreman and zoom boom operator to stand and weld Pre-frab building. (Burnaby)

  • Great West Equipment - Supplied iron workers and welding trucks to stand and weld pre fab building. (Port Kells)

bottom of page